Gravity Utility Systems and Microtunnelling Construction

Sewage and storm water deep utilities network
Storm water outfalls, culverts and flow dissipation structures
Non-disruptive crossings to taxiways

ABOUT THE
BUILD

Al Naboodah Construction Group was awarded the deep utilities and sewage contract for the Abu Dhabi Airports Project in March 2012.

The sewage and storm water deep utilities network was required to service the new airport terminal as well as future planned facilities including additional cargo terminals and various support buildings for the new terminal. As part of the network, various structures were also required such as storm water outfalls, culverts and flow dissipation structures.

The most critical parts of this project were the non-disruptive crossings to taxiways G and H, which connect existing south and north runways.