Client :

Government of Dubai, Department of Civil Aviation

Completion date :

April 2010

  • SHARE PROJECT

Dubai International Airport Expansion (Phase Two)

00
Contact
stands

ABOUT THE
BUILD

Concourse 3 is an extension, yet integral part, of the continuous development of Concourses 1 and 2 at Dubai International Airport. Partially an underground structure, including Automated People Moving (APM) stations for both arrivals and departures, the concourse extends above ground under a metal shell to accommodate 20 aircraft stands – 18 of which are designed to accommodate the Airbus 380 – in addition to holding room for six more aircraft on remote stands.

Similar to Concourse 2, the building shell of Concourse 3 has the same characteristics of size and shape. With an overall footprint of 90m by 645m on a built area of approximately 528,000m², the building includes the Emirates airline lounges and hotels, as well as the arrival and departure floors with a duty-free area.

Approximately 1 million m³ of reinforced concrete was poured over a two-year period for this contract. It is the single largest Dubai contract to date undertaken by Al Naboodah Construction Group and employed 7,500 people.

Project Slider
Project Slider
Project Slider
Project Slider
geometry
THE
FACTS

m³ of reinforced concrete

000000m3

people employed

7,500